Welcome to the Architect Hub. This is a page for collaboration of Architects in Wolvhaven to build projects that are planned or are under construction.
Ongoing Projects
IF YOU HAD DONE ANYTHING THAT IS NEEDED TO BE DONE IN THE PLAN, PLEASE EDIT ANYTHING THAT HAVE BEEN CHANGED BEFORE TO SHOW THE CURRENT PROGRESS.
Wolvhaven Metro Mechburg Extension Project
Project name: WolvHaven Metro Phase 2: East Mechanicsburg Extension
Players who are currently responsible for the project: chickenjoshbwak (Head Architect)
Company(s): Fried Transportation - Temaqix Holdings
Line 1 Extension Project
Line 1
Introduction: Metro Line 1, the oldest metro line in WolvHaven will be extended from its current Northern Terminus, La Resistance, to Mechanicsburg station via underground tunnels. Mechanicsburg, a station situated in Northwest Mechanicsburg, will be the brand new terminus for Metro Line 1.
La Resistance (1)(2)(10) -<>- Northgate (1)(7) -<>- Mechanicsburg (1)(6)(8) >>>> Mechanicsburg Depot
Project Section Code (P=Plan D=Design C=Construction T=Technical Edits) | Project Section Name | Percentage of Completion (Approximate Value) | Status of Completion |
---|---|---|---|
P1 | Planning of tunnel route | 100% |
COMPLETED |
D1 | Finalization of station layouts | 100% |
COMPLETED |
D2 | Finalization of station designs | 100% |
COMPLETED |
C1 | Tunnel burrowing | 100% |
COMPLETED |
C2 | Construction of La Resistance M1 station platforms | 100% |
COMPLETED |
C3 | Construction of Northgate M1 station platforms | 100% |
COMPLETED |
C4 | Construction of Mechanicsburg M1 station platforms | 90% |
INCOMPLETED |
C5 | Tunnel Link to Mechanicsburg Depot | 100% |
COMPLETED |
T1 | Implementation of Metro+ Card Readers | 0% |
INCOMPLETED |
T2 | Implementation of train spawning mechanism | 100% |
COMPLETED |
T3 | Implementation of signage | 100% |
COMPLETED |
- Any aspiring FTRANS Partners wanting to propose any sorts of designs or have any queries shall do so in the Temaqix Holdings discord, specifically in the #ftrans channel at https://discord.gg/BjyDC7Y.:
Line 4 Extension Project
Line 4 Metro Line 4 will be extended from Dakota Interchange, will continue North and stop at Ditchill and York stations with trains pulling into the East River Depot, bringing an end to service.
Dakota (2)(4) -<>- East river (4)(7) -<>- York (4)(6)(7)(8) >>>> East River Depot
Project Section Code (P=Plan D=Design C=Construction T=Technical Edits) | Project Section Name | Percentage of Completion (Approximate Value) | Status of Completion |
---|---|---|---|
P1 | Planning of tunnel route | 100% |
COMPLETED |
D1 | Finalization of station layouts | 60% |
INCOMPLETED |
D2 | Finalization of station designs | 20% |
INCOMPLETED |
C1 | Tunnel burrowing | 5% |
INCOMPLETED |
C2 | Construction of Dakota M4 station platforms | 100% |
COMPLETED |
C3 | Construction of Ditchill M4 station platforms | 100% |
COMPLETED |
C4 | Construction of York M4 station platforms | 60% |
INCOMPLETED |
C5 | Tunnel Link to East River Depot | 0% |
INCOMPLETED |
T1 | Implementation of Metro+ Card Readers | 0% |
INCOMPLETED |
T2 | Implementation of train spawning mechanism at Depot | 0% |
INCOMPLETED |
T3 | Implementation of signage | 5% |
INCOMPLETED |
Extra Info : M4's terminus platform will be on the top platform, with trains heading to City Hall will be the one at the bottom.
- Any aspiring FTRANS Partners wanting to propose any sorts of designs or have any queries shall do so in the Temaqix Holdings discord, specifically in the #ftrans channel at https://discord.gg/BjyDC7Y.:
Line6/8 Extension Project
Line 6/8
Hillview (6) -<>- Bohill (6) -<>- York (4)(6)(7)(8) >>>> East River Depot
Project Section Code (P=Plan D=Design C=Construction T=Technical Edits) | Project Section Name | Percentage of Completion (Approximate Value) | Status of Completion |
---|---|---|---|
P1 | Planning of tunnel route | 100% |
COMPLETE |
D1 | Finalization of station layouts | 100% |
COMPLETE |
D2 | Finalization of station designs | 100% |
COMPLETE |
C1 | Tunnel burrowing | 100% |
COMPLETE |
C2 | Construction of Hillview M6 station platforms | 100% |
COMPLETE |
C3 | Construction of Bohill M6 station platforms | 100% |
COMPLETE |
C4 | Construction of York M6 and M8 station platforms | 100% |
COMPLETE |
C5 | Tunnel Link to East River Depot | 100% |
COMPLETE |
T1 | Implementation of Metro+ Card Readers | 100% |
COMPLETE |
T2 | Implementation of train spawning mechanism | 100% |
COMPLETE |
T3 | Implementation of signage | 70% |
INCOMPLETE |
- Any aspiring FTRANS Partners wanting to propose any sorts of designs or have any queries shall do so in the Temasaac Holdings discord, specifically in the #ftrans channel at https://discord.gg/BjyDC7Y.:
Line 7 Extension Project
Line 7
Primerose(3)(6)(7)(8) -<>- Sillonner (7) -<>- Highgate (1)(7) -<>- Ditchill (4)(7) -<>- York (4)(6)(7)(8) >>>> East River Depot
Planning of tunnel/viaduct route : INCOMPLETE Finalization of station layouts : INCOMPLETE Finalization of station designs : INCOMPLETE Tunnel burrowing : COMPLETE Construction of Sillonner M7 station platforms : COMPLETE Construction of Highgate M7 station platforms : INCOMPLETE Construction of Ditchill M7 station platforms : INCOMPLETE Construction of York M7 station platforms : INCOMPLETE Implementation of Metro+ Card Readers : INCOMPLETE Tunnel link to East River Depot : INCOMPLETE Implementation of train spawning mechanism @ Depot : INCOMPLETE Implementation of signage : INCOMPLETE
Info : We are uncertain how Line 7 will go from Highgate to Depot.
- Any aspiring FTRANS Partners wanting to propose any sorts of designs or have any queries shall do so in the Temaqix Holdings discord, specifically in the #ftrans channel at https://discord.gg/BjyDC7Y.:
North South Expressway(NSE)& CIE Extension Project
Project name: North South Expressway (From Stadium to York) and CIE extension to Mechanicsburg
Players who are currently responsible for the project: minebuilder1223, GukkyGukz
Project Section Code (P=Plan D=Design C=Construction T=Technical Edits) | Project Section Name | Percentage of Completion (Approximate Value) | Status of Completion |
---|---|---|---|
P1 | Planning of expressway viaducts and interchange | 100% |
COMPLETED |
D1 | Finalization of Interchange layouts | 100% |
COMPLETED |
D2 | Finalization of viaduct designs | 100% |
COMPLETED |
C1 | Construction of NSE main viaducts | 100% |
COMPLETED |
C2 | Construction of CIE main tunnels | 100% |
COMPLETED |
C3 | Construction of the NSE and CIE interchange | 100% |
COMPLETED |
C4 | Construction of Streets around the interchange | 90% |
INCOMPLETED |
C5 | Interchange decorations and greenery | 100% |
COMPLETED |
T2 | Road markings | 100% |
COMPLETED |
T3 | Implementation of signage | 100% |
COMPLETED |
Info: The NSE will extend to Central and East Mechanicsberg and connect with CIE with a huge interchange in the middle. the CIE tunnel have reached to the ground and the construction of the interchange are currently ongoing.
If you have any questions about the plan and construction feel free to make a sentence below: