Gardellia Mainlines Expo Line
Jump to navigation
Jump to search
This article is under Construction. As a result, It may be unfinished. You can help by editing this page.
When this page is sufficiently long, Remove this template. |
Gardellia Mainlines - Expo Line | |
---|---|
80px | |
A photo of an Expo Line rail corridor, taken by MineShafter61 | |
Overview | |
Type | Commuter Rail |
System | Gardellia Mainline |
Status | Operational |
Termini | - |
Stations | - |
Services | 1 |
Operation | |
Opened | - |
Operator(s) | TransHaven |
Character | - |
Depot(s) | - |
Rolling stock | - |
Technical | |
Line Length | - |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC Third rail |
Operating speed | 200km/h (124.2 mph) |
Route Map | |
- |
The Expo Line is an upcoming Gardellian Mainline that is set to be open by 2020. The line will serve as a gateway to the Gardellia Expo, granting easy access to commuters coming from Commonwealth, or the upcoming One-North Line. Once opened, it will be the ninth Gardellian Mainline.
The Expo line will be coloured grey on the mainline map.
|
|