Warracknabeal Island Metro

From Wolv Haven Wiki
Jump to navigation Jump to search
Warracknabeal Island Metro
Warracknabeal Metro Map.png
Overview
Lines 4 (Stage 1) (4 Under Construction)
Stations 10 (Stage 1)
Specifications
Rolling Stock TBD

Warracknabeal Island Metro is a metro operator in Warracknabeal Island. All line are Semi-Auto and is operated by Woo Transport.

Routes

Name Status Start Station End Station Stations Stock operated Year Opened Operation Type Operated By
West Coast Line      Under Construction Domain Cross Arlenaou 3 TBA TBA Semi-Auto Woo Transport
Central Line      Under Construction - Opening 8/06/2020 Domain Cross North Head Beach 4 Woo A1 Stock 2020 Semi-Auto Woo Transport
South Coast Line      Under Construction Domain Cross North head 5 TBA TBA Semi-Auto Woo Transport
East Coast Line      Under Construction Domain Cross Wakakirri 4 TBA TBA Semi-Auto Woo Transport

Central Line

The Central line operates between Domain Cross and North Head Beach. Operated by Woo Transport and their A1 stock. Currently, all systems are in place westbound from Domain Cross. Eastbound is still under construction. the official opening will be on the 8/06/2020. The time is currently unknown. WillieWoo has stated the line will probably open at 5PM AEST.