Warracknabeal Island Metro |
---|
|
Overview |
---|
Lines |
4 (Stage 1) (4 Under Construction) |
---|
Stations |
10 (Stage 1) |
---|
Specifications |
---|
Rolling Stock |
TBD |
Warracknabeal Island Metro is a metro operator in Warracknabeal Island. All line are Semi-Auto and is operated by Woo Transport.
Routes
Name |
Status |
Start Station |
End Station |
Stations |
Stock operated |
Year Opened |
Operation Type |
Operated By
|
West Coast Line |
Under Construction |
Domain Cross |
Arlenaou |
3 |
TBA |
TBA |
Semi-Auto |
Woo Transport
|
Central Line |
Under Construction - Opening 8/06/2020 |
Domain Cross |
North Head Beach |
4 |
Woo A1 Stock |
2020 |
Semi-Auto |
Woo Transport
|
South Coast Line |
Under Construction |
Domain Cross |
North head |
5 |
TBA |
TBA |
Semi-Auto |
Woo Transport
|
East Coast Line |
Under Construction |
Domain Cross |
Wakakirri |
4 |
TBA |
TBA |
Semi-Auto |
Woo Transport
|
Central Line
The Central line operates between Domain Cross and North Head Beach. Operated by Woo Transport and their A1 stock. Currently, all systems are in place westbound from Domain Cross. Eastbound is still under construction. the official opening will be on the 8/06/2020. The time is currently unknown. WillieWoo has stated the line will probably open at 5PM AEST.