Gardellia Mainlines Circular Line
Gardellia Mainlines - Circular Line | |
---|---|
A Circular Line rail viaduct | |
Overview | |
Type | Commuter Rail |
System | Gardellia Mainline |
Status | Operational |
Termini |
Fulton Isle CCS7 |
Stations |
26 (Operational) 1 (Planned) |
Services | 1 |
Operation | |
Opened | 1st Qtr 2017; 3 years ago |
Operator(s) | TransHaven |
Character | Overground (Caerdyfrdwy - CCS7) |
Depot(s) | N/A |
Rolling stock | - |
Technical | |
Line Length | - |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) standard gauge |
Electrification | 750 V DC Third rail |
Operating speed | 200km/h (124.2 mph) |
Route Map | |
Formerly known as the Gardellia Mainlines Green Line, the Gardellia Mainlines Circular Line is one of the seven Gardellia Mainlines in service.
Spanning 27 stations in total, including a planned station between GS1 and GN1, the Circular Line is one of the longer mainlines in Gardellia.
Inaugurated in the 1st quarter of 2017, the line opened as the fourth Gardellian mainline, after the North-East (formerly Red), North-West (formerly Blue), and Central Peninsula (formerly Yellow) lines.
The line is coloured in green on the mainline map.
Overview
As the name implies, the Gardellia Mainline Circular Line runs in a half-circular direction, spanning from Caerdyfrdwy, bypassing cities like Konstanz and Nelsonburg, while also going through major interchanges like Clexio Bay and Les Vincennes Bay. The line eventually heads south and passes through cities like Admiral and Furthrat, before ending up in its southern terminus at CCS7. At max speed, going from one terminus to the other takes roughly 35 minutes.
History
First phase of development
Originally supposed to make its debut alongside with the North-West, North-East, and Central Peninsular Lines, the Circular Line fell short of industrial standards and was plagued with many issues regarding the line's viaducts, particularly when it came to diagonal track sections. The issues were so severe to the point where delaying the official opening of New Gardellia was heavily considered. Eventually, all issues were overcame and the line opened for service from Konstanz to Furthrat on 26th December 2016, on the official opening of Gardellia.
Second phase of development
As empty stations lessened and the need for new settlements got bigger, it was decided on December 2017 to extend the Circular Line further west.
The second phase stretches from Konstanz to Caerdyfrdwy.
Third phase of development
As a part of the Southern Gardellia Expansion Project (SGEP), the Circular Line was planned to extend further south beyond Furthrat, passing through settlements (which are now currently defunct), such as Magdalenenburg and New Winchester. The extension would bring about seven brand new stations, ready for claiming, bringing new life and access to Southern Gardellia. The southern extension, spanning from CC-S1 to CC-S7, was opened and introduced to the public on the 25th of December, 2019.
Future development works
The line is scheduled to be extended soon as part of the Southern Gardellia Expansion Project, with plans being brought up, and the public inquiry, regarding the best possible route for the line. The line is expected to head westbound, joining up with the southern terminus of the Island Line, altering the current shape of the line from an arc, to a circle. On February 22, 2020, RKZ_Mclaren2169 of Nueva Puertollano announced that a new yard is being built. It can accommodate 7 trains, with 2 modified for double configurations, and 2 that are extended to the shops. The yard house will have a control room, that dictates signaling, speed limits, and points along CC-S7 all the way to Les Vincennes Bay. It is currently in the works in the Lab world, with the tracks leading to the mainline fitted after the yard has been pasted. The estimated time until it is completed is somewhere about September of 2020 until January of 2021.
Date | Event |
---|---|
26 December 2016 | Konstanz - Furthrat |
12 December 2017 | Caerdyfrdwy - Konstanz |
25 December 2019 | Furthrat - CCS7 |
Mid to late 2020 | Caerdyfrdwy - CCS7 |
Stations
Station Number | Station Name | Station Claimant | Interchange/Notes |
---|---|---|---|
CC-N1 IS-N7 | Caerdyfrdwy | minebuilder1223 | Interchange station with Island line |
CC-N2 | Shibe Island | HariLyonbabba | |
CC-N3 | Potus | hinwapoon | |
CC-N4 | Konstanz | mopsistudios | This station is claimable. Please contact mopsistudios. |
CC-N5 | Forbach | mopsistudios | |
CC-N6 | Nelsonburg | sambrose, Heiopeii | |
CC-N7 NW-N9 | Sint Maartenstad | HurricanePanda08 | Interchange station with North-West line |
CC-N8 | Unclaimed | ||
CC-N9 CP-N7 | Minehall | Vixitron | Interchange station with Central Peninsular line |
CC-N10 | San Rafael | Frosty_Creeper10 | |
CC-N11 NC-N14 NB-N1 |
Clexio Bay | Soso123 | Interchange station with Northern Connector line and Northeastern Bypass |
CC-N12 | Infill Station (2021) | ||
CC-N13 | Parramatta Bay | MC_Dunc | |
CC-N14 | Unclaimed | ||
CC-N15 | Unclaimed | ||
CC-N16 | Rotherhithe | autobus22 | |
CC-N17 | Ipswich Garden City | _sSamuel (spamuel) | |
CC-N18 NE-N8 | Les Vincennes Bay | VincentLUMCFan | Interchange station with North-East line |
CC-N19 | Marriot | ohuehue (_AngelKevin_) | |
CC-N20 | Verandah | ohuehue & jotch | |
CC-N21 BA-N1 | Furthrat Common | jotch (chickenjoshbwak) | Interchange station with Bay Area line (in 2021) |
CC-S1 | Canderford | CrazySharkGaming | |
CC-S2 | Unclaimed | ||
CC-S3 | Eastbourne | _lykan | |
CC-S4 | Unclaimed | ||
CC-S5 | Unclaimed | ||
CC-S6 | New Puertollano | RKZ_Mclaren2169 (Mclaren2119) | |
CC-S7 | Unclaimable |
Infrastructure
Rolling Stock
The Circular Line makes use of the SW05-EMU, a modified and modernised version of the SM05, one of the rolling stocks used during the first days of the WolvHaven Metro.
Developed in early 2016, the SW05-EMU is a high-speed steel-wheel electric multiple unit trainset that is thenfirst of its kind, reaching up to 250km/h at top speeds.
They were delivered to Gardellia on 15 November 2016, and put in service on 26 December 2016.
Semi Automatic Operation (SAO)
The Circular line utilises a unique method of managing the amount of trains on the line at one point of time. Instead of trains spawning and despawning at a depot somewhere along the line, the Circular line, along with all the other Gardellia Mainlines, makes use of Semi Automatic Operation.
In this operative system, trains do not require a driver to be driven, meaning each mainline has constantly accessible trains. Secondly, trains can spawn and despawn at every station, making wait times infinitesimally small, while also limiting the amount of trains on the line at one time, leading to lower ping, and faster connections.
Signalling
See also
- Gardellia Mainlines
- Gardellia Mainlines Central Peninsular Line
- WolvHaven Metro
- Web:Department Of Transport
|
|